Filming is now taking place on Saturday 20th November. It will be situated in the attic i have took pictures of, and that will now be the only location.
Checklist:
Laptop/charger
Costume
Make-up
Camera/Tripod/Battery
Electric Keyboard/Drum?
Storyboard
These are the most important things that i will be needing.
add some posts with images from the day's filming. shots of you and the girls on location will do it.
ReplyDelete